|| 1.0 || 19Mar11 || IDS-NF-020-v1.0.pdf || <<AttachGetFile(IDS-NF-020-v1.0.tar.gz, "IDS-NF-020-v1.0.tar.gz")>> || Submitted to the ECFA neutrino panel. || || 1.0 || 19Mar11 || <<AttachGetFile(IDS-NF-020-v1.0.pdf, "IDS-NF-020-v1.0.pdf")>> || <<AttachGetFile(IDS-NF-020-v1.0.tar.gz, "IDS-NF-020-v1.0.tar.gz")>> || Submitted to the ECFA neutrino panel. ||

Interim Design Report: document history page

IDS-NF IDR version history

Version

Date posted

File name

Tar ball`

Comments

1.0

19Mar11

IDS-NF-020-v1.0.pdf

IDS-NF-020-v1.0.tar.gz

Submitted to the ECFA neutrino panel.

Specification for the IDR

The 'specifications' for the report, discussed at the 5th IDS-NF Plenary meeting and agreed within the Steering Group are:

  • Self-contained, consistent summary of the physics case for the Neutrino Factory and a concise explanation of the baseline for the accelerator complex and neutrino detectors. The IDR should be supported where appropriate by detailed technical reports published as IDS-NF (EUROnu) notes. Of course, it may be appropriate to publish some of these reports as papers in their own right. The IDR should include an extended bibliography of the associated technical reports;
  • Alternatives to the baseline, limited in number, will be described briefly in the IDR. Additional details should be provided in an Appendix to the report or a separate IDS-NF note/publication;
  • The costing for the IDR will be presented in an Appendix with a summary of the results of the costing being contained in the main report.