Interim Design Report: document history page
IDS-NF IDR version history
Version |
Date posted |
File name |
Tar ball |
Comments |
1.0 |
19Mar11 |
Submitted to the ECFA neutrino panel. |
||
2.0 |
19Oct11 |
Published as a BNL, CERN, EUROnu, FERMILAB and RAL notes. arXiv:1112.2853v1 [hep-ex] |
||
2.1 |
|
|
EUROnu WP3 note number corrected. |
Specification for the IDR
The 'specifications' for the report, discussed at the 5th IDS-NF Plenary meeting and agreed within the Steering Group are:
- Self-contained, consistent summary of the physics case for the Neutrino Factory and a concise explanation of the baseline for the accelerator complex and neutrino detectors. The IDR should be supported where appropriate by detailed technical reports published as IDS-NF (EUROnu) notes. Of course, it may be appropriate to publish some of these reports as papers in their own right. The IDR should include an extended bibliography of the associated technical reports;
- Alternatives to the baseline, limited in number, will be described briefly in the IDR. Additional details should be provided in an Appendix to the report or a separate IDS-NF note/publication;
- The costing for the IDR will be presented in an Appendix with a summary of the results of the costing being contained in the main report.