Differences between revisions 8 and 9
Revision 8 as of 2013-04-05 17:31:07
Size: 1190
Editor: paulSoler
Comment:
Revision 9 as of 2013-04-06 11:06:29
Size: 1190
Editor: ajitKurup
Comment:
Deletions are marked like this. Additions are marked like this.
Line 12: Line 12:
|| 16:50 || Engineering: target and chicane (<<AttachMacro(AWG1-TargetChicane-1-v1,ppt,RAL-2013-04-05/Agenda/Accelerator/Files)>>) || K. !McDonald || || 16:50 || Engineering: target and chicane (<<AttachMacro(AWG1-TargetChicane-1-v2,ppt,RAL-2013-04-05/Agenda/Accelerator/Files)>>) || K. !McDonald ||

Saturday, 6 April 2013

Accelerator WG Session 1: 16:00 to 17:30, Conference Room 12, R65
Engineering and Costing
Session chair: TBD

16:00

Costing for the RDR (pdf )

A. Kurup

16:25

Engineering status and RDR plans (pptx )

N. Collomb

16:50

Engineering: target and chicane (ppt )

K. McDonald

17:15

Discussion: engineering and costing in the RDR

Sunday, 7 April 2013

Accelerator WG Session 2: 09:00 to 10:30, Conference Room 12, R65
Requirements and Work Assignments for the RDR
Session chair: TBD

09:00

Introduction (pdf )

J. S. Berg



Files Page

RAL-2013-04-05/Agenda/Accelerator (last edited 2013-04-06 11:06:29 by ajitKurup)